Every project operates under dedicated site superintendence, rigorous material testing protocols, and complete trade coordination to honor original architectural specifications without compromise.
Potrero Hillside concrete residence
Tolerances to Three Millimeters
18,000 SF Hillside Monolith
Board-formed architectural walls cast with tongue-and-groove Douglas fir timber, delivering uninterrupted grain continuity across three levels and sixteen distinct structural planes.
Engineered on a 42-degree grade utilizing thirty-eight drilled cast-in-place concrete piers anchored directly to Franciscan bedrock. The build required continuous grade beam pours and custom perimeter shoring along adjacent property lines.
Zero Schedule Variance
Full structural sign-off achieved across twenty-two critical path milestones, completing turnkey delivery four weeks ahead of prime commercial contract commitments.
Initiate tender drawing review
Our estimating department reviews drawing sets and specifications for commercial, institutional, and private projects within five business days.